A Groundwork company - serving Allen, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · McKinney, TX

ADU Site Prep & Utilities in McKinney - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Allen
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in McKinney: What’s Actually Involved

ADU Site Prep & Utilities in McKinney runs $45,000 – $130,000 for the site work side of a detached or attached unit, and most projects land in the 6-to-14-week range from first excavation to final utility inspection. That covers grading, the pad or pier foundation, water and sewer runs, the electrical service and meter, and gas if you’re running it. It does not cover the structure itself. Call (888) 343-9048 and we’ll walk your lot line with you before anyone quotes a number.

Call (888) 343-9048

How We Run the Job, Stage by Stage

A finished backyard cottage with a small covered porch

Most contractors quote site prep as a lump number and then disappear for two weeks. Here’s the actual sequence so you know what day one looks like and when you need to make a decision.

Stage 1: Lot Survey and Utility Locate (Days 1 – 3)

We start by pulling the plat and confirming setbacks, easements, and where the existing water, sewer, and electric actually enter the main house. Texas811 marks the buried lines, and we hand-dig to confirm depth on anything the marks don’t cover. You’ll need to confirm your target ADU footprint at this point, because moving it ten feet later costs real money. Grading follows within a day or two once the footprint is locked.

Stage 2: Excavation and Grading (Days 4 – 8)

Cut and fill to bring the pad to finished grade, with drainage sloped away from both the ADU and your main house. On McKinney’s blackland clay we over-excavate and re-compact in lifts, because the native soil swells and shrinks with the seasons and a pad built on undisturbed clay will move. This is also when we trench for water, sewer, and conduit. You’ll decide the pad elevation here, and that decision drives how much dirt leaves the site.

Stage 3: Foundation and Utility Rough-In (Weeks 2 – 4)

Slab on grade, pier and beam, or a post-tension slab depending on the soil report and the unit’s footprint. While the concrete cures, we run the water line, sewer lateral, and electrical conduit to the tie-in points. This is where most of the surprises live – an old clay sewer line that won’t handle the added load, or a panel with no spare capacity. You’ll choose the foundation type and confirm the tie-in points with a licensed plumber and electrician.

Stage 4: Inspections (Weeks 4 – 5)

The city inspects the underground plumbing, then the electrical rough-in, then the foundation. Each inspection is a separate scheduled visit and a failed one can push the timeline a week. We build schedule float around the inspection window and don’t pour or backfill until each one passes.

Stage 5: Utility Bring-Up and Final Grade (Weeks 5 – 7)

The meter set, the final tie-in to the house service, and the finish grading, including any French drain or swale the lot needs. You’ll pick fixtures at this stage – a Sterling or Grohe rough-in valve set now so the finish trim goes in without a second visit later. Sod and landscaping go last, once the trenching is closed and settled.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

None of these are cosmetic. Each one changes the number and the long-term maintenance load on a McKinney lot.

  • Slab on grade vs. pier and beam. A slab is faster and cheaper up front. Pier and beam gives you a service cavity for plumbing and easier repair on expansive clay, but costs more and needs skirting and ventilation detail. On heavily treed or grade-variable lots, pier and beam usually wins.
  • Utility trench depth and conduit. Running direct-burial cable is cheaper; running conduit lets you pull wire later without digging. On a long drive to the back of the lot, conduit pays for itself the first time something fails.
  • Electrical service size. A 60-amp subpanel suits a basic one-bedroom unit; a full electric range, heat pump, and EV charger will need 100 amps or more. Ask your electrician to run the load calculation before you commit.
  • Sewer tie-in vs. grinder pump. Gravity is best. If the ADU sits below the main house’s sewer invert, a grinder pump is the fallback and adds ongoing maintenance and noise.
  • Grading and drainage detail. Basic slope is standard; a French drain or swale along the low side of the lot costs more but prevents water pooling against the new foundation.

What ADU Site Prep & Utilities Costs in McKinney, TX

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for the site and utility scope, with the structure billed separately. The low end is a flat, straightforward lot on a short run from the house. The high end is a back-lot build with long trench runs, a grinder pump, and heavy grading.

What moves the number:

  • Utility run distance. Moving water, sewer, and power from the far side of the house to the back of the lot can double the trenching and material.
  • Foundation type and soil. Pier and beam on expansive clay runs higher than a plain slab.
  • Sewer conditions. A gravity tie-in is the baseline; a grinder pump and lift station adds cost and maintenance.
  • Grading volume. Sloped lots mean more cut, fill, and haul-off.
  • Permit scope. More inspections and separate trade permits add fees and schedule time.

A written estimate should list every line – excavation, foundation, plumbing rough, electrical rough, gas, permits, and final grade – with a fixed number and no change orders for the scope shown. What it typically excludes is the ADU structure itself, finish landscaping, and any unexpected repair like a collapsed sewer line found during trenching.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What McKinney Homes Specifically Do to This Job

McKinney sits on blackland prairie clay, and that fact drives the entire foundation decision. The soil swells in spring and shrinks in the July heat, so we design pads and pier depths around seasonal movement rather than assuming the ground is stable. On the older 75069 lots near the historic downtown square, the existing water, sewer, and electric are often undersized for an added unit, and the home’s era means the utility tie-in needs a careful look before we commit. In the 75070 and 75071 corridors – Stonebridge Ranch, Adriatica, and the newer subdivisions – the lots are typically tract-built on a standard grid, but HOA rules on accessory structures and fencing can add a review step before permitting. Homeowners often pair this with Concrete Driveways & Concrete Work in McKinney so the new unit has a proper access apron, and some go with Paver Driveways in McKinney if the HOA prefers pavers on the visible frontage.

Our Approach on a McKinney Lot

We do the site work and utilities as one coordinated job, so the trench, the pad, and the trades are scheduled together rather than strung out across three separate contractors. Our technicians have up to 12 years of experience on this kind of ground-up utility and foundation work, and every one is background-checked and arrives in uniform. The whole scope sits under our 730-Day Done Right Promise and comes with upfront pricing – the number on the quote is the number you pay, with 0% financing for 18 months and $1,000 off projects over $10,000 available. When the wider project is on the table, this fits into a full Home Additions & ADU in McKinney build, and you can see that full Home Additions & ADU service on our main page. We cover McKinney and the surrounding area, including Melissa, Allen, Princeton, and Fairview.

Serving McKinney, TX – Our Local Coverage Area

We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in McKinney

Get a Free On-Site Estimate

A new multi-panel patio door opening a kitchen to the patio

Bring us your lot and your ADU plan. We’ll walk the tie-in points, flag the grading and soil issues up front, and hand you a fixed, line-item estimate for the site prep and utilities in McKinney – no vague ranges, no change orders for the scope shown. Call (888) 343-9048, and a live person answers whenever you call.

Written by the team at Groundwork Construction Co.

Why McKinney Chooses Groundwork Construction Co. of Allen

We set the standard for ADU site prep & utilities in McKinney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in McKinney

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What McKinney Customers Say

Trusted by homeowners across McKinney and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver border

More services in McKinney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Allen

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Allen team

A local vetted partner works across Allen and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in McKinney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in McKinney.

(888) 343-9048

Request a Free Estimate in McKinney

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch