Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Wylie: Cost, Timeline, and What You Get
A garage conversion ADU in Wylie typically runs $45,000 to $130,000 and takes 8 to 16 weeks from permit to final inspection, depending on whether you’re adding a bathroom and kitchenette or just finishing out a bedroom and living space. The job turns your existing attached or detached garage into a legal, permitted second dwelling on the same slab, which means new framing, insulation, HVAC, electrical, plumbing, and interior finishes. Call (888) 343-9048 and we’ll walk your garage in person and put a real number in writing.
What the Build Actually Looks Like, Stage by Stage

Most contractors hand you a lump-sum bid and disappear. Here’s the sequence we follow, with the decisions you’ll make along the way so nothing catches you off guard mid-build.
Stage 1: Assessment and design, week one to two
Day one is a walkthrough of the existing slab, the garage door opening, the shared wall with the house, and the electrical panel to confirm there’s enough capacity for a full ADU. You’ll decide the layout – studio, one-bedroom, or one-bedroom with a kitchenette – and whether the garage door opening gets infilled with framing or glass. We pull the survey, confirm setbacks, and put together drawings for submittal.
Stage 2: Permitting, week two to four
Wylie requires a building permit and the plan review covers structural, electrical, plumbing, and mechanical in one pass. We submit, respond to any reviewer comments, and coordinate inspections with the city. You don’t chase signatures – we handle the submittal and keep you posted on the timeline.
Stage 3: Demo and rough-in, week four to seven
The garage door comes out, the opening gets framed and closed, and we add a proper vapor barrier and slab moisture control because North Texas clay moves. Rough plumbing (bath, kitchenette, water heater) and rough electrical get run, then the framing and mechanical inspections happen before anything gets closed up.
Stage 4: Insulation, drywall, and finishes, week seven to thirteen
Spray foam or batt insulation, drywall, then flooring, cabinetry, fixtures, HVAC trim, and paint. This is where your material choices land – LVP versus tile, Sterling fixtures versus Grohe, a ductless mini-split versus tying into the main system.
Stage 5: Final inspection and handoff, week thirteen to sixteen
Final electrical, plumbing, and building inspections, then a walkthrough where we demonstrate systems, hand over warranty paperwork, and confirm punch items are closed. Every project is backed by our 730-Day Done Right Promise – if it isn’t done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Options You’ll Choose Between
The choices below move the price the most. Here’s the honest trade-off on each.
- Garage door opening treatment. Framing it in and stuccoing or bricking to match is the cheapest and most private – usually $1,500 to $3,500. A glass slider or French door adds light and a patio feel but runs $4,000 to $9,000 and needs a header sized for the span.
- HVAC. A ductless mini-split handles most single-room ADUs efficiently and avoids running ducts back to the main system, $4,000 to $8,000 installed. Extending the house system costs less on paper but strains capacity.
- Flooring. Luxury vinyl plank over the slab handles moisture swings and cleans easily, $3 to $6 per square foot. Porcelain tile holds up better in a kitchenette and bath, $6 to $12 per square foot.
- Fixtures and finishes. Sterling and Grohe are a solid middle ground – reliable parts availability, clean looks, fair price. Imported tile and linear drains push the bathroom budget up 30 to 50 percent.
- Kitchenette scope. A sink, mini-fridge, and two-burner cooktop keeps it simple. A full range and hood require more ventilation and electrical work.
What a Garage Conversion ADU Costs in Wylie, TX

Expect $45,000 to $130,000 for a full, permitted garage conversion ADU in Wylie. The low end is a studio with a half bath and no kitchenette. The high end is a one-bedroom with a full bath, kitchenette, upgraded finishes, and a new exterior door.
| Scope item | Typical range |
|---|---|
| Shell, framing, and door infill | $10,000 – $22,000 |
| Electrical and plumbing rough-in | $8,000 – $18,000 |
| HVAC (mini-split or extension) | $4,000 – $9,000 |
| Bathroom build-out | $9,000 – $28,000 |
| Kitchenette | $6,000 – $18,000 |
| Insulation, drywall, paint | $5,000 – $12,000 |
| Flooring and trim | $3,000 – $9,000 |
| Permit and plan review | $1,200 – $3,500 |
Five variables push the number toward the high end: slab condition and moisture control, moving plumbing away from the garage’s existing corner, adding a second bathroom, tying into the main electrical panel versus a subpanel, and finish grade. Written estimates list line items, not a single lump number, so you can see exactly where the money goes. Get a free estimate and we’ll break it out for you.
See the difference
Before
After
Before
After
Before
AfterHow Wylie’s Housing Stock Changes This Job
Wylie flipped from a small farm town to a fast-growing Collin County suburb in about two decades, and almost nothing in the housing stock predates the 1990s boom. The garages we convert here are mostly attached two-car slabs in subdivisions off FM 544, Highway 78, and around the newer builds north of Stone Road and near the Woodbridge and Birmingham Farms neighborhoods. Because the slabs are post-tension and set on expansive blackland clay, the garage floor often has a slight slope toward the door for drainage – which means we’re leveling with a self-leveling underlayment before flooring goes down, and we grade the new exterior entry so water runs away rather than pooling at the threshold.
Permitting runs through the City of Wylie, and plan review here is reasonably quick when the submittal is complete. If the garage is on a lot with a recent HOA, the ACC approval for exterior door style and roofing color usually needs to happen before permit submittal, so we coach you on that timeline up front. The climate matters too: spring hail and hard summer heat mean roofing patch work and HVAC sizing get careful attention, not a generic add-on. Our technicians have up to 12 years of experience with North Texas slabs and framing.
Serving Wylie, TX – Our Local Coverage Area
We serve Wylie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Wylie

Most conversions take 8 to 16 weeks from permit issuance to final inspection, with permitting itself adding two to four weeks. A simple studio runs closer to 8 to 10 weeks; a one-bedroom with kitchenette and full bath runs 14 to 16 weeks. Call (888) 343-9048 for a timeline specific to your garage.
Yes. Wylie requires a building permit for any conversion that changes the use of the garage, and permits cover building, electrical, plumbing, and mechanical. We handle the submittal, respond to reviewer comments, and coordinate all inspections as part of the project.
Often yes – if you place the bath and kitchenette near an existing exterior wall, plumbing can tie into the house’s main without relocating supply or drain lines. Structural changes are usually limited to infilling the garage door opening and adding a header if you want a glass door instead. The trade-off is layout flexibility.
Plan on $45,000 to $130,000 depending on scope, bathroom count, kitchenette, and finish grade. Call (888) 343-9048 for a written line-item quote – estimates are free and there’s no pressure to move forward on the call.
Every conversion is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right. That’s backed in writing and applies to workmanship across framing, finishes, and systems install.
Get a Free On-Site Estimate for Your Garage Conversion ADU in Wylie
Call (888) 343-9048 to schedule a free on-site estimate for your garage conversion ADU in Wylie. A live person answers 24/7 – no voicemail. We’ll walk your garage, listen to how you want the space used, and put a written line-item estimate in your hands. No-hassle upfront pricing, and the number you see is the number you pay. When your project expands beyond the garage, our Home Additions & ADU service and the Home Additions & ADU in Wylie page cover the wider scope, and homeowners often pair this with Concrete Driveways & Concrete Work in Wylie to reroute parking after the garage comes out of service. We work throughout Wylie, including Sachse, Murphy, Rowlett, and Fairview, and can fold in Asphalt Driveways & Resurfacing in Wylie when a new driveway layout makes sense. Reach out today.
Written by the team at Groundwork Construction Co.