







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterCabinets & Countertops in Allen, TX
New cabinets and countertops in Allen, TX typically run $6,500 to $28,000 depending on the cabinet grade, the countertop material, and how much of the kitchen layout changes. That’s the whole job – tear-out, new boxes and doors, slab or surface fabrication, sink and faucet rough-in, and finish. Most kitchens in Allen are finished inside two to three weeks once material lands.
Cabinets and countertops carry a kitchen more than any other two decisions. They set the layout, they take the daily beating, and they’re what a buyer looks at first. Get them wrong and you’ll feel it every morning you open a sticky drawer. Get them right and a 1990s Allen kitchen reads like a new build.
Groundwork Construction Co. of Allen handles this as part of our Kitchen Remodeling work across Allen and the surrounding Collin County neighborhoods – West Allen, Bethany Ridge, Fountain Park, Twin Creeks, and the older pockets near downtown off Main Street. We install KraftMaid cabinetry and Cambria quartz, and we back every installation with our 730-Day Done Right Promise. If a door sags in year one, we fix it. Not a service call fee conversation.
Call (888) 343-9048 and a live person answers, day or night. No voicemail, no waiting until Monday.

What Actually Drives a Cabinet and Countertop Decision in Allen
Allen has a specific housing stock, and it shapes what we recommend. The big master-planned neighborhoods – Twin Creeks, Bethany Ridge, Fountain Park – were built mostly from the late 1990s through the 2000s. That means a lot of oak cabinets with a honey finish, laminate or older granite counters, and a floor plan that’s good but not great. Homeowners in these homes are usually replacing rather than repairing, and they’re doing it because they’ve lived with the layout long enough to know exactly what’s wrong with it.
The older homes closer to downtown Allen and along the older streets off Main are a different conversation. Cabinet boxes may be solid where the doors and drawer fronts have given out. Sometimes we reface instead of replace, and that saves real money.
Then there’s the Texas heat and humidity. Allen summers push cabinets through daily expansion and contraction, and we see it in door alignment and drawer glide wear. We spec soft-close, full-extension hardware specifically because it survives North Texas better than the standard glides most builder-grade cabinets ship with. It’s a small line item that saves a decade of annoyance.
Materials matter here too. We work with a curated set of brands – KraftMaid for cabinetry and Cambria for quartz – because we’ve installed them long enough to know how they hold up. When it comes to the sink and faucet, Moen and Blanco are the two we reach for most often in Allen kitchens, and both have local parts availability if anything ever needs a replacement cartridge.
When You Need Cabinets & Countertops
Most of our Allen cabinet and countertop calls come from one of these situations. If any of them sound familiar, you’re not guessing – you’re ready.
- Your cabinet doors no longer close flat. In Allen’s older homes, we regularly see hinges that have pulled from the frame after twenty years of daily use. Sometimes that’s a hardware swap. Sometimes it’s a sign the boxes have warped and refacing won’t hold.
- The countertop is chipped, stained, or scorched. Laminate from a 1990s build doesn’t age well, and once a seam lifts near the sink, water gets underneath. That’s not a cosmetic problem for long.
- You’re planning to sell within two years. Kitchen updates remain one of the highest-return improvements a homeowner can make, and buyers in the Allen market know what quartz and soft-close feel like. They walk into a kitchen and touch the drawers.
- The layout fights you daily. Not enough counter space near the range. No landing zone beside the fridge. A peninsula that blocks the traffic flow between the kitchen and the family room. New cabinets are the moment to fix the floor plan, not just the faces.
- Water damage under the sink. Slow leaks rot the cabinet floor before anyone notices. If you smell something musty when you open the doors, that’s worth a look before you spend money on new fronts over a failing base.
- You want to add an island or extend the counter run. Common in Allen homes where the original kitchen had good bones but a tight work triangle.

Our Cabinets & Countertops Process
We run this the same way every time, because the surprises live in the gaps between steps. Here’s the sequence.
- In-home consultation and measurement. We come out, look at the actual kitchen, and talk through what you use it for. A family that cooks every night has different needs than a household that mostly reheats. We measure to the sixteenth, because slab fabrication and cabinet runs don’t forgive rounding.
- Design and material selection. We walk you through cabinet door styles, finishes, and the countertop options that fit your budget and your habits. Quartz is the default in Allen because it doesn’t need sealing and it handles heat and stains; granite still has its fans. We bring samples so you’re choosing against your actual lighting, not a showroom’s.
- Upfront written pricing. The number you see is the number you pay. No line items that grow after the contract is signed, no “we found something” phone call halfway through. If we discover an issue during tear-out – a soft subfloor, out-of-square walls – we tell you before we act and price it before we charge it.
- Tear-out and site prep. Old cabinets and counters come out carefully. Floors and adjacent rooms get protected. We handle disposal, which is not a small cost in Collin County if you’re renting a dumpster yourself.
- Installation. Cabinet boxes are set level and plumb, doors and drawers aligned, hardware installed, then the countertop template is taken after the boxes are in. That order matters – templating before cabinets are set is how you get a slab that doesn’t fit. Sink and faucet go in after the counter, and we test every connection before we call it done.
- Final walkthrough and sign-off. We open every door and drawer with you, check the reveals and the seams, and make sure you’re satisfied before we leave. Anything that needs adjustment gets adjusted.
Throughout, a background-checked, uniformed technician is on the job. Our installers have up to 12 years of experience, and they’ve seen the layout issues in Allen homes enough times to catch them early. You’ll know who’s coming and roughly when – not a rotating cast of crews in unmarked vans.
Cabinets & Countertops Pricing in Allen
Here’s the honest range. These are real numbers we work from in the Allen market, not marketing teasers. Actual pricing depends on cabinet grade, countertop material, linear feet, and whether the layout changes.
| Item | Typical Range (Allen, TX) |
|---|---|
| Stock / semi-custom cabinet replacement (per linear foot, installed) | $180 – $420 |
| Custom cabinetry (per linear foot, installed) | $450 – $900+ |
| Cabinet refacing (per linear foot) | $95 – $220 |
| Laminate countertop (per square foot) | $25 – $55 |
| Quartz countertop (per square foot, installed) | $55 – $120 |
| Granite countertop (per square foot, installed) | $50 – $110 |
| Sink and faucet installation (labor, hardware separate) | $250 – $650 |
| Full cabinet and countertop package, standard Allen kitchen | $6,500 – $28,000 |
What moves the number most: cabinet grade (stock versus custom), whether the layout changes, and countertop material. A straight swap of semi-custom cabinets and quartz into the same footprint lands near the bottom of the package range. Add an island, move the sink, or go custom cabinetry and you’re moving toward the top. Quartz, which is what most Allen homeowners choose, runs more than laminate but doesn’t need resealing and holds up to a house full of kids.
We give you the number up front, in writing, before any work starts. We also offer 0% financing for 18 months and $1,000 off projects over $10,000, which is what most full cabinet and countertop packages in Allen end up hitting. That takes a big project from “someday” to “next month.”
Every job comes with our 730-Day Done Right Promise – one of the longest workmanship guarantees in residential construction. If something isn’t right, we make it right. That’s the whole clause.
Ready for a real number? Call (888) 343-9048 for a free project estimate and design consult. No pressure, no sales script.
Why Groundwork for Cabinets & Countertops in Allen
Cabinet and countertop work has a reputation for the disappearing crew. The bid that turns into three change orders. The warranty that turns out to cover almost nothing. We built Groundwork Construction Co. of Allen to be the opposite of that experience, and it shows in three concrete ways on this kind of job.
You get a written number and a real guarantee. Upfront pricing means the number you see is the number you pay, and the 730-Day Done Right Promise means the work is covered for two full years after we walk out the door. That’s not a marketing line – it’s the reason some of our best referral sources in Fountain Park and Twin Creeks are the homeowners we finished for two years ago.
You reach a live person, any time. Calls are answered 24/7 by an actual human. If your new faucet develops a drip on a Saturday night, you’re not leaving a voicemail and waiting.
Our customers stay with us across projects. A kitchen cabinet and countertop installation isn’t the end of the relationship – it’s usually the start. Homeowners in Allen who start with us on cabinets often come back for home projects across the property. That’s how we grow in a market like Allen – one finished kitchen at a time.
Cabinet and Countertop Materials We Install in Allen
We keep a short, curated list of brands for a reason: we want to install materials we’ve watched hold up over time, not whatever a supplier is pushing that quarter.
KraftMaid cabinetry is our go-to for the broad middle of the market. Solid construction, a wide door-style range, and finishes that hold through Allen’s summer humidity swing. For homeowners who want to move up to custom, we walk through that option during the design visit.
Cambria quartz is what we install most in Allen countertops. Non-porous, no sealing, and the color doesn’t fade. For kitchens with heavy daily use – which is most households in the Twin Creeks and Bethany Ridge subdivisions – quartz makes the most sense for the money.
For sinks and faucets, Moen and Blanco are the two brands we return to most often. Moen’s cartridge-based faucets are straightforward to service if anything needs attention years down the road, and Blanco’s undermount sinks hold their finish. Delta is a solid alternative we install when a homeowner prefers their styling or a specific feature – their pull-down sprayers are popular with our Allen customers.
On the hardware side, we spec soft-close hinges and full-extension, soft-close drawer glides as the default, not an upgrade. The cost difference is modest; the difference in how a kitchen feels after five years is substantial.
How Long Does It Take?
For a standard Allen kitchen – straight cabinet swap, new countertop, sink and faucet – you’re typically looking at two to three weeks from tear-out to walkthrough. Cabinet fabrication is the long pole, and semi-custom lines run three to five weeks to deliver after the order is finalized. We schedule tear-out after material is on-hand, not before, so you’re not living with an empty kitchen for a month.
A larger job that includes moving the sink or adding an island extends the timeline – usually four to five weeks. We give you the specific schedule before we start and call you if anything shifts.
What to Expect During the Job
You’ll have a dedicated point of contact for your project, and a background-checked, uniformed installer on site. Floors and adjacent rooms are protected. We handle debris disposal. And we clean up at the end of each workday, so your kitchen doesn’t turn into a construction site you can’t walk through.
We give you realistic daily expectations up front. If you need to know which days the countertop template and installation will happen, we tell you that before we start. A one-day surprise we could have warned you about is the kind of thing we try to eliminate.
If anything doesn’t look or feel right – alignment, finish, a door that rubs – we want to hear it during the walkthrough, not two years later. That’s what the process is for.
Cabinets & Countertops FAQs
How much do new cabinets and countertops cost in Allen, TX?
A full cabinet and countertop package for a standard Allen kitchen typically runs $6,500 to $28,000. The low end covers semi-custom cabinets and quartz in an unchanged layout; the high end covers custom cabinetry, an island addition, or a layout change. We give you the exact number in writing before work begins. Call (888) 343-9048 for a free estimate – estimates are free, and we come to you.
Should I reface or replace my cabinets?
Refacing makes sense when the cabinet boxes are solid and only the doors and drawer fronts are worn. In Allen homes built from the late 1990s onward, we usually find boxes that are holding up well and faces that have seen better days – refacing can save real money there. Replacing is the right call when the boxes have warped, when the layout is wrong, or when you want to change the configuration. We look at the actual boxes during the consultation and tell you which one applies, not the other way around.
Is quartz better than granite for a kitchen?
For most Allen kitchens, quartz is the practical choice. It’s non-porous, doesn’t need annual sealing, and handles heat and stains well. Granite remains a good option for homeowners who prefer its natural variation. We install both, and we bring samples so you can see how each reads against your actual kitchen lighting before you commit. Call (888) 343-9048 with questions or to set up a consult.
Can you install new countertops without replacing the cabinets?
Yes, in many cases. If the existing cabinet boxes are level and structurally sound, a countertop replacement alone is a straightforward job. We check the boxes during the measurement visit to confirm they’ll support a new slab. In some Allen homes, we find cabinets that are slightly out of level – installing new counters over those will show a gap or a mismatched seam. We’ll tell you which situation you’re in before you spend money.
Do you offer financing for cabinet and countertop projects in Allen?
Yes. We offer 0% financing for 18 months, plus $1,000 off projects over $10,000. Most full kitchen cabinet and countertop replacements in Allen qualify for the discount. Call (888) 343-9048 to go through the numbers with a real person.
Are your installers background-checked and insured?
Yes. Every technician on a Groundwork job is background-checked and arrives in uniform. We don’t send crews in unmarked vans. Our installers have up to 12 years of experience on cabinet and countertop work, and every project is covered by our 730-Day Done Right Promise.
Getting Started
If your Allen kitchen is ready for new cabinets or countertops – or both – the first step is a free estimate and design consult. Call (888) 343-9048 and a live person will pick up. We’ll come out, look at the space, walk through materials, and give you a real number in writing. No voicemail, no waiting, no vague bids that grow after you sign.
From foundation to finish line, one contractor, one written number, one guarantee that runs for two full years after the job is done. That’s what we bring to every kitchen in Allen.
Written by the team at Groundwork Construction Co. of Allen, serving Allen.


