Garage Conversion ADU in McKinney: What It Costs and How Long It Takes
A garage conversion ADU in McKinney typically runs $45,000 to $130,000, and most projects take 10 to 16 weeks from permit to final inspection. The work turns an attached or detached garage into a permitted living space with its own entrance, bathroom, and small kitchen. It’s the least expensive way to add rentable or family square footage here, because the foundation, roof, and exterior walls already exist. Call (888) 343-9048 to schedule a free on-site estimate.
How a Garage Conversion ADU Comes Together, Stage by Stage

Garage conversions fail on the front end, not the back. Most of the money is decided before a single wall goes up, so we spend the first week getting the plan and the permit right. Here’s the real sequence.
Stage 1: Assessment and design (week 1)
We open the garage up and check the slab, the ceiling height, and where the utilities run. You decide whether you want a full kitchen or a kitchenette, and whether the garage door opening gets framed in or converted to a window wall. Plan and permit drawings follow, usually in five to seven working days.
Stage 2: Permitting (2 to 5 weeks, McKinney-specific)
Your timeline depends entirely on where you sit in McKinney. A conversion in the 75069 historic core can take longer than a tract-home garage in Stonebridge Ranch or Adriatica, because the historic overlay review can add weeks to the front end. You decide nothing here except patience; we handle submittal and plan review.
Stage 3: Demo and rough-in (weeks 3 to 6)
Out goes the garage door, opener, and any shelving. We pour or top the slab where the old drain sat, frame the new partitions, and rough in plumbing and electrical. Then come the insulation, HVAC tie-in or mini-split, and the rough inspection. You pick fixtures now so they arrive before the walls close.
Stage 4: Finishes (weeks 6 to 12)
Drywall, texture, paint, flooring, cabinets, countertops, and trim. This is the slowest stage and the one you’ll walk through most often. You sign off on paint color, floor type, and the bathroom layout before we set the vanity.
Stage 5: Final inspection and punch (weeks 12 to 16)
Final inspection, then a walkthrough where we note every gap and fix it before you pay the last draw. Most punch lists clear in a week. If your conversion is part of a full Home Additions & ADU in McKinney scope, we sequence this stage against the rest of the build so the inspections stack cleanly.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
- Garage door opening: Frame it in with siding and a window wall (cleanest look, roughly $2,500 to $6,000), or keep a working roll-up door as a privacy screen for a workshop-style room. Framing in is more durable and more weatherproof.
- Flooring: Luxury vinyl plank handles the slab moisture you’ll see in North Texas clay and runs $3 to $6 a square foot. Engineered hardwood looks warmer but costs more and needs a vapor barrier. Porcelain tile is the toughest in kitchens and baths.
- HVAC: A mini-split keeps the space zoned off the house and costs $4,000 to $8,000 installed. Tying into the home’s existing system is cheaper but drags the main unit if the garage is far from the air handler.
- Kitchen and bath fixtures: Moen and Delta faucets are the reliable middle ground most clients pick. A Blanco sink in the kitchenette holds up better than an entry-level stainless unit. American Standard toilets are easy to source and service.
- Insulation: Spray foam in the walls and ceiling is worth the upgrade here. McKinney’s humid summers punish fiberglass batting in a converted garage, and foam cuts the cooling bill and the noise.
What a Garage Conversion ADU Costs in McKinney, TX

The honest number is $45,000 to $130,000, and where you land depends on how much plumbing and finish grade you’re adding. A simple studio with a bathroom sits near the low end; a one-bedroom with a full kitchen and premium finishes climbs toward the top.
- Shell and framing: $8,000 to $22,000, including the new garage-door wall and exterior repair.
- Plumbing and electrical rough-in: $9,000 to $25,000. Moving the bathroom to the far corner of the garage is what pushes this line up.
- HVAC: $4,000 to $8,000.
- Insulation, drywall, and paint: $6,000 to $16,000.
- Kitchen and bathroom: $10,000 to $35,000, driven by cabinet grade and fixture line.
- Flooring and trim: $3,500 to $12,000.
- Permits, plans, and inspection: $1,500 to $5,000.
What moves that range most: the size of the garage, whether the slab needs repair, how far plumbing has to travel, the finish grade you choose, and whether the plan triggers extra review in McKinney. A written estimate from us lists every line item and doesn’t move once work starts. If you’re also reworking the approach to the new unit, homeowners often pair this with Concrete Driveways & Concrete Work in McKinney so the ADU has a proper walk and parking pad.
See the difference
Before
After
Before
After
Before
AfterWhat McKinney Homes Specifically Do to This Job
McKinney is a split city, and it changes how a garage conversion ADU gets built depending on ZIP code. If you’re in 75069, near the historic square, you may be working on an early-1900s Victorian or Craftsman with an older detached garage, and the historic overlay can add weeks to exterior changes. We plan for that review up front. In the 75070 and 75071 corridors, from Stonebridge Ranch up through Adriatica, you’re working on a 1990s-to-2010s tract home where the garage is attached, the slab is usually sound, and permitting moves faster. The one thing both sides share is the blackland prairie clay. Slab movement shows up as cracks and door-swing drift, so we check the slab before we commit to a flooring plan. Every McKinney job we run carries the 730-Day Done Right Promise, and calls come to a live person 24/7. We cover the full city through our McKinney service area.
Serving McKinney, TX – Our Local Coverage Area
We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in McKinney

Most garage conversion ADU projects in McKinney take 10 to 16 weeks from permit to final inspection. Historic-overlay properties in 75069 can run longer on the front end. Call (888) 343-9048 for a timeline on your specific garage.
Yes. A garage conversion ADU requires a building permit and inspections for electrical, plumbing, and HVAC. A garage that was once a parking space and becomes living space also needs a certificate of occupancy before you can rent it. We pull the permit and manage the inspections.
Sometimes. A bathroom near an existing drain line makes this possible, but a kitchenette in the far corner usually means new plumbing. We assess the layout in the first week and tell you honestly what stays and what moves. Call (888) 343-9048 to book the assessment.
Expect $45,000 to $130,000 depending on size and finish grade. The low end is a studio with a bathroom; the high end is a one-bedroom with a full kitchen and premium materials. Call (888) 343-9048 for an exact quote; estimates are free.
Every Garage Conversion ADU we build is backed by the 730-Day Done Right Promise. If something we built fails inside that window, we make it right. If your project is part of a full Home Additions & ADU scope, the same guarantee applies to the whole build.
Get a Free Garage Conversion ADU Estimate in McKinney
Call (888) 343-9048 for a free on-site estimate in McKinney. We’ll open the garage, measure the slab, check the utilities, and talk through your options before you commit to anything. You’ll leave the visit with a written line-item quote and a realistic timeline, not a handshake and a ballpark. Estimates are free, and the price you see is the price you pay. Homeowners planning exterior work around the new unit often pair this with Asphalt Driveways & Resurfacing in McKinney.