Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Rowlett, TX: What They Cost and How Long They Take
Cabinets & countertops in Rowlett typically run $14,000 – $45,000 and take about two to four weeks from demolition to final trim, with the countertop template and install itself eating roughly a week of that. Most 1980s – 2000s Rowlett homes we work in keep the same footprint, so the job is usually a straight swap: out with the old boxes, in with new, then the counter goes on top. Call (888) 343-9048 to schedule a free on-site estimate and get a written line-item number.
How we run a cabinet and countertop job, stage by stage

It’s not complicated once you’ve done it a few hundred times, but the order matters. Here’s the sequence we follow.
Stage 1: Measure and layout (day 1, about 90 minutes)
We measure the existing run wall to wall, check for out-of-square corners, and look at what’s behind the backsplash and under the sink. This is where you decide cabinet layout, door style, and finish. On a 20 – 40 year old Rowlett home we usually find the walls are off plumb by a half inch or more, and the plan has to accommodate that with filler strips or a scribed end panel.
Stage 2: Demo and prep (1 to 2 days)
Old cabinets come out, along with the counter. We cap the water lines, pull the disposal, and check the subfloor for water damage around the sink and dishwasher. On slab-on-grade homes, that area is worth a hard look because a slow leak under the sink goes unnoticed for years. You decide at this point whether to keep the sink location or move it, which is the single biggest cost trigger in the whole job.
Stage 3: Cabinet install (2 to 3 days)
Base cabinets go in first, shimmed level and screwed to the studs, then wall cabinets, then the crown and light rail. Doors and drawers get adjusted here, not later. You’re picking hardware pulls at this point if you haven’t already, and a 30-inch run of cabinets typically needs 5 to 7 pulls.
Stage 4: Countertop template and install (5 to 10 days total)
Stone and quartz counters get templated after the cabinets are set, because they’re cut to the actual cabinet top, not the drawing. Template on a Monday, install the following week is normal. Laminate can be measured and cut faster, but stone takes the lead time. You’ll finalize the edge profile and sink cutout before the template is cut.
Stage 5: Sink, faucet, and final walkthrough (1 day)
Plumber sets the sink and faucet, we seal the counter to the wall, and then we walk the job with you. Every project carries our 730-Day Done Right Promise: if something isn’t right, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
Here’s where the honest trade-offs live. Every one of these is a real choice, and none of them is universally correct.
- Stock, semi-custom, or full-custom cabinets. Stock is fastest and cheapest with fixed sizes; semi-custom lets you shift widths by inches; full-custom matches any dimension but adds weeks. Most Rowlett tract homes are fine with semi-custom.
- Plywood vs. particleboard boxes. Plywood holds screws better and resists moisture around a sink; particleboard is cheaper and fine in dry zones. Full plywood runs a meaningful percentage higher on the cabinet line item.
- Thermofoil, painted MDF, or wood veneer doors. Thermofoil is durable and easy to wipe down but can peel at edges over time in a hot kitchen. Painted MDF looks great but can chip. Wood veneer takes a refinish; the other two don’t.
- Quartz, granite, or laminate counters. Quartz needs no sealing and is uniform in color; granite is natural and one-of-a-kind but wants resealing; laminate is the budget play and holds up well if you don’t set a hot pan on it.
- Undermount vs. drop-in sink. Undermount looks cleaner and makes wiping the counter into the sink easier, but requires a stone shop to cut the hole, adding time and cost.
We work with KraftMaid and Cambria for cabinets and counters, and can spec other brands if you have one in mind.
What cabinets and countertops cost in Rowlett, TX

Full cabinet and countertop replacement in Rowlett lands between $14,000 and $45,000. Cabinet installation alone sits at $4,000 – $13,000, countertop installation at $2,000 – $6,500, and an island, if you’re adding one, at $3,000 – $10,000. Add a backsplash and that’s $800 – $2,500 on top.
Five things push a job toward the high end:
- Kitchen size. A 12-linear-foot galley is a different job than a 30-foot L with an island.
- Moving the sink, range, or dishwasher. Relocating plumbing or a 240V range circuit is the biggest single adder, often several thousand dollars.
- Cabinet construction grade. Full-plywood boxes and soft-close hardware cost more than stock and standard hinges.
- Counter material. Laminate versus quartz is a noticeable swing on the counter line item.
- Wall and floor condition. Out-of-square walls, water damage, or a floor that needs leveling before cabinets go down.
A written estimate here lists cabinet brand and box construction, door style and finish, hardware, counter material and edge profile, sink and faucet, and the plumbing and electrical allowances. What it does not cover: structural changes, moving a load-bearing wall, or repair of hidden damage found after demo. Those get written up as a change order before we touch them.
See the difference
Before
After
Before
After
Before
AfterWhat Rowlett homes specifically do to this job
Rowlett was mostly built out as planned subdivisions from the 1980s through the 2000s, so almost everything we work on here is a 20-to-40-year-old brick-veneer home with a slab-on-grade foundation and wood-frame walls. In practice that means we’re almost always working around existing conditions, not new construction. Cabinet runs in these homes are rarely perfectly square, and the counter has to be templated to the real cabinet top, not the drawing.
Slab movement is a recurring theme in this part of North Texas. Expansive clay soils shift with wet and dry cycles, and we routinely see counters that were level 15 years ago and now have a visible gap at one end. If the slab has moved, we shim the cabinets level and template the counter to the cabinet, but we always tell a homeowner if the underlying slab movement is significant enough to flag for a foundation check first. That conversation has to happen before the counter gets cut, not after.
On permitting: swapping cabinets and counters in the same footprint generally doesn’t require a permit in Rowlett, but moving plumbing, adding electrical circuits, or altering structure does. We handle the permitting and inspections on any project that needs them and don’t start cut work until the permit is in hand. If you’re planning cabinets as part of a full Kitchen Remodeling in Rowlett, the permit scope widens and so does the schedule.
Serving Rowlett, TX – Our Local Coverage Area
We serve Rowlett and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: cabinets and countertops in Rowlett

Plan on two to four weeks start to finish, with the counter template and install eating about a week of that. Cabinet install itself is 2 to 3 days, and demolition and prep is 1 to 2 days. Quartz or granite adds wait time versus laminate. Call (888) 343-9048 for a schedule estimate specific to your kitchen.
Usually not, if you’re keeping the same footprint and not touching plumbing or electrical. Moving a sink, adding a circuit for a new range, or altering a wall does require a permit, and we pull it and handle the inspections. We’ll tell you in the estimate whether your job falls on the permit side.
Yes, and that’s the standard approach for most Rowlett homes. Keeping the sink, range, and dishwasher where they are saves several thousand dollars compared to relocating them. If you want to move the sink, we’ll show you what that adds before the work starts.
Between $14,000 and $45,000 for a full replacement. Cabinets alone run $4,000 – $13,000, counters $2,000 – $6,500, and a new island $3,000 – $10,000. Call (888) 343-9048 for an exact quote. Estimates are free.
Our 730-Day Done Right Promise covers workmanship for two years: if it’s not done right, we come back and make it right. Manufacturer warranties on cabinets and counters stack on top of that. We put the details in writing before the job starts.
Get a free cabinets and countertops estimate in Rowlett
Call (888) 343-9048 and a live person answers, any hour, any day. We’ll schedule a free on-site estimate, measure the kitchen, and hand you a written line-item quote with pricing locked in, no change-order surprises. If you’re weighing this against a bigger project, we can talk through pairing it with a full Kitchen Remodeling, a Garage Conversion ADU in Rowlett, or a New Detached ADU in Rowlett. We serve all of Rowlett, including the 75088, 75089, and 75030 ZIPs. $1,000 off projects over $10,000 and 0% financing for 18 months are available.
Written by the team at Groundwork Construction Co.