A Groundwork company - serving Allen, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · McKinney, TX

Garage Conversion ADU in McKinney - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Allen
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in McKinney: What It Costs and How Long It Takes

A garage conversion ADU in McKinney typically runs $45,000 to $130,000, and most projects take 10 to 16 weeks from permit to final inspection. The work turns an attached or detached garage into a permitted living space with its own entrance, bathroom, and small kitchen. It’s the least expensive way to add rentable or family square footage here, because the foundation, roof, and exterior walls already exist. Call (888) 343-9048 to schedule a free on-site estimate.

Call (888) 343-9048

How a Garage Conversion ADU Comes Together, Stage by Stage

A garage converted into a guest room and home office

Garage conversions fail on the front end, not the back. Most of the money is decided before a single wall goes up, so we spend the first week getting the plan and the permit right. Here’s the real sequence.

Stage 1: Assessment and design (week 1)

We open the garage up and check the slab, the ceiling height, and where the utilities run. You decide whether you want a full kitchen or a kitchenette, and whether the garage door opening gets framed in or converted to a window wall. Plan and permit drawings follow, usually in five to seven working days.

Stage 2: Permitting (2 to 5 weeks, McKinney-specific)

Your timeline depends entirely on where you sit in McKinney. A conversion in the 75069 historic core can take longer than a tract-home garage in Stonebridge Ranch or Adriatica, because the historic overlay review can add weeks to the front end. You decide nothing here except patience; we handle submittal and plan review.

Stage 3: Demo and rough-in (weeks 3 to 6)

Out goes the garage door, opener, and any shelving. We pour or top the slab where the old drain sat, frame the new partitions, and rough in plumbing and electrical. Then come the insulation, HVAC tie-in or mini-split, and the rough inspection. You pick fixtures now so they arrive before the walls close.

Stage 4: Finishes (weeks 6 to 12)

Drywall, texture, paint, flooring, cabinets, countertops, and trim. This is the slowest stage and the one you’ll walk through most often. You sign off on paint color, floor type, and the bathroom layout before we set the vanity.

Stage 5: Final inspection and punch (weeks 12 to 16)

Final inspection, then a walkthrough where we note every gap and fix it before you pay the last draw. Most punch lists clear in a week. If your conversion is part of a full Home Additions & ADU in McKinney scope, we sequence this stage against the rest of the build so the inspections stack cleanly.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

  • Garage door opening: Frame it in with siding and a window wall (cleanest look, roughly $2,500 to $6,000), or keep a working roll-up door as a privacy screen for a workshop-style room. Framing in is more durable and more weatherproof.
  • Flooring: Luxury vinyl plank handles the slab moisture you’ll see in North Texas clay and runs $3 to $6 a square foot. Engineered hardwood looks warmer but costs more and needs a vapor barrier. Porcelain tile is the toughest in kitchens and baths.
  • HVAC: A mini-split keeps the space zoned off the house and costs $4,000 to $8,000 installed. Tying into the home’s existing system is cheaper but drags the main unit if the garage is far from the air handler.
  • Kitchen and bath fixtures: Moen and Delta faucets are the reliable middle ground most clients pick. A Blanco sink in the kitchenette holds up better than an entry-level stainless unit. American Standard toilets are easy to source and service.
  • Insulation: Spray foam in the walls and ceiling is worth the upgrade here. McKinney’s humid summers punish fiberglass batting in a converted garage, and foam cuts the cooling bill and the noise.

What a Garage Conversion ADU Costs in McKinney, TX

A framer checking new wall framing on a home addition

The honest number is $45,000 to $130,000, and where you land depends on how much plumbing and finish grade you’re adding. A simple studio with a bathroom sits near the low end; a one-bedroom with a full kitchen and premium finishes climbs toward the top.

  • Shell and framing: $8,000 to $22,000, including the new garage-door wall and exterior repair.
  • Plumbing and electrical rough-in: $9,000 to $25,000. Moving the bathroom to the far corner of the garage is what pushes this line up.
  • HVAC: $4,000 to $8,000.
  • Insulation, drywall, and paint: $6,000 to $16,000.
  • Kitchen and bathroom: $10,000 to $35,000, driven by cabinet grade and fixture line.
  • Flooring and trim: $3,500 to $12,000.
  • Permits, plans, and inspection: $1,500 to $5,000.

What moves that range most: the size of the garage, whether the slab needs repair, how far plumbing has to travel, the finish grade you choose, and whether the plan triggers extra review in McKinney. A written estimate from us lists every line item and doesn’t move once work starts. If you’re also reworking the approach to the new unit, homeowners often pair this with Concrete Driveways & Concrete Work in McKinney so the ADU has a proper walk and parking pad.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What McKinney Homes Specifically Do to This Job

McKinney is a split city, and it changes how a garage conversion ADU gets built depending on ZIP code. If you’re in 75069, near the historic square, you may be working on an early-1900s Victorian or Craftsman with an older detached garage, and the historic overlay can add weeks to exterior changes. We plan for that review up front. In the 75070 and 75071 corridors, from Stonebridge Ranch up through Adriatica, you’re working on a 1990s-to-2010s tract home where the garage is attached, the slab is usually sound, and permitting moves faster. The one thing both sides share is the blackland prairie clay. Slab movement shows up as cracks and door-swing drift, so we check the slab before we commit to a flooring plan. Every McKinney job we run carries the 730-Day Done Right Promise, and calls come to a live person 24/7. We cover the full city through our McKinney service area.

Serving McKinney, TX – Our Local Coverage Area

We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in McKinney

A galley kitchen opened up to the dining room with a new peninsula

Get a Free Garage Conversion ADU Estimate in McKinney

Call (888) 343-9048 for a free on-site estimate in McKinney. We’ll open the garage, measure the slab, check the utilities, and talk through your options before you commit to anything. You’ll leave the visit with a written line-item quote and a realistic timeline, not a handshake and a ballpark. Estimates are free, and the price you see is the price you pay. Homeowners planning exterior work around the new unit often pair this with Asphalt Driveways & Resurfacing in McKinney.

Written by the team at Groundwork Construction Co.

Why McKinney Chooses Groundwork Construction Co. of Allen

We set the standard for garage conversion ADU in McKinney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in McKinney

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What McKinney Customers Say

Trusted by homeowners across McKinney and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in McKinney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Allen

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Allen team

A local vetted partner works across Allen and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in McKinney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in McKinney.

(888) 343-9048

Request a Free Estimate in McKinney

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch