Cabinets & Countertops in Anna, TX: What the Job Really Involves
Cabinets & countertops in Anna, TX typically run $14,000 – $45,000 for a full kitchen’s worth of new cabinetry and stone or solid-surface tops, with most homes landing near the middle of that range. Plan on three to five weeks from demo to final caulk, longer if you’re waiting on a slab or a custom cabinet run. Call (888) 343-9048 and we’ll walk your Anna kitchen and give you a written, line-item number. Estimates are free.
How We Run a Cabinet and Countertop Job, Stage by Stage

Every job has the same five stages. What changes is how much of your existing kitchen survives and how long the material lead times stretch.
Stage 1 – Measure and template (day 1, about 90 minutes). We laser-measure the walls, check for out-of-square corners and level issues, and photograph the plumbing and electrical locations behind the current cabinets. You decide the door style, finish, and whether appliances stay or get replaced. On Anna slab homes, this is also where we flag any wall movement that would throw a cabinet run out of plumb before anything gets ordered.
Stage 2 – Demo and prep (days 2 – 3). Old cabinets and tops come out, drywall gets patched, and we shut off and cap the plumbing. If outlets or the range hood need to move, that happens now. You confirm final cabinet layout and sign off on any change to where the sink or range lands. This is the stage where surprises hide – a soft spot in the subfloor or a water line that isn’t where the drawings said.
Stage 3 – Cabinet install (days 4 – 6). Base cabinets set first, leveled and shimmed, then uppers hung and everything scribed to the wall. Crown and light rail go on. Counters can’t be templated until this is done and locked in.
Stage 4 – Countertop template and fabrication (days 7 – 21). A template goes to the fabricator, then the slab is cut, edged, and polished. This is the longest gap, and it’s mostly waiting. You pick the edge profile and confirm the sink cutout and faucet hole placement during this window.
Stage 5 – Countertop install, sink, and finish (days 22 – 25). Tops set and seamed, sink and faucet dropped in, dishwasher reconnected, caulk and touch-up. Final walkthrough the same day. Most jobs finish in 25 working days barring custom cabinet lead times, which can add two to four weeks.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
These are the real forks in the road. Each one has a cost and a consequence.
- Cabinet boxes – stock, semi-custom, or custom. Stock comes in fixed sizes and ships fast; it suits a simple layout. Semi-custom gives you modified dimensions and more finishes for a moderate premium. Custom is built to your kitchen’s exact quirks, which matters in older Anna homes where nothing is square.
- Door material – MDF, plywood, or solid wood. MDF paints cleanly and resists the North Texas humidity swings well. Plywood holds up better at the joints. Solid wood is the premium pick and the most maintenance-sensitive.
- Countertop surface – quartz, granite, or solid surface. Quartz is non-porous and low-maintenance; it’s the most popular choice for good reason. Granite is natural stone with real variation and needs sealing. Solid surface can be sanded and repaired but scuffs more easily.
- Sink and faucet pairing. An undermount sink needs a solid-surface or stone top to carry it. A Moen or Delta pull-down faucet is the workhorse pick; a Blanco composite sink handles heat and stain better than enamel over time.
- Edge profile and backsplash height. A simple eased edge keeps fabrication cost down. A full-height backsplash is a bigger visual statement but adds scope to a job that starts as cabinets and tops.
What Cabinets & Countertops Cost in Anna, TX

The full range here is $14,000 – $45,000. Cabinet work alone typically lands $4,000 – $13,000, and countertops $2,000 – $6,500. Where your number sits depends on five variables:
- Kitchen size and cabinet linear feet. A 20-foot run of base and uppers is a very different job from a galley.
- Material grade. Stock MDF and laminate at one end, custom wood and quartz at the other.
- Moving plumbing, gas, or electrical. Relocating a sink or range adds real money and often a permit.
- Existing condition. Out-of-square walls, water damage, or a settling slab all add prep.
- Permit scope. A straight swap usually needs no permit; moving plumbing or adding circuits does.
A written estimate covers demolition, cabinet supply and install, countertop fabrication and install, sink and faucet install, and cleanup. It usually does not cover appliance purchase, drywall and paint beyond patchwork, or flooring repair where old cabinets sat. We put everything in writing – the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Anna Homes Specifically Do to This Job
Anna’s housing stock shapes this work. The newer master-planned tracts north of US-75 are full of builder-grade cabinets – particleboard boxes, thermofoil doors, and laminate tops – that start failing around year eight to twelve. On those same lots, expansive blackland clay and fresh fill dirt mean walls move, and a cabinet run that was plumb at install can go out of square within a few years. We template and shim for that movement rather than pretend it doesn’t happen. Homes near the older town core have the opposite problem: small kitchens and framed walls that aren’t square to begin with. Either way, most Anna cabinet jobs are less about repairing old wood and more about fixing what a fast build left behind. If the wider project includes new layout work, that’s part of our Kitchen Remodeling in Anna scope, and we work it through our full Kitchen Remodeling service line that covers Anna and the surrounding area.
And if the kitchen work is part of a larger plan to carve out more living space, homeowners often pair this with a Garage Conversion ADU in Anna or a New Detached ADU in Anna built around the same time.
Serving Anna, TX – Our Local Coverage Area
We serve Anna and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Anna

Most jobs run three to five weeks, with the countertop fabrication window the longest wait. Custom cabinets can add two to four weeks. Call (888) 343-9048 for a schedule built around your material choices.
A straight swap of like-for-like cabinets and tops usually needs no permit. Moving plumbing, gas, or electrical circuits does. We pull the permits when the scope calls for them and you see the inspection pass before we close out. Call (888) 343-9048 to confirm your specific scope.
Yes. Most jobs keep the sink and range where they are, which keeps the cost down and the timeline tight. Relocating either one adds money and a permit. We price both versions so you can see the difference in writing.
Expect $14,000 – $45,000 depending on size, material grade, and whether plumbing or electrical moves. Cabinet work alone runs $4,000 – $13,000 and countertops $2,000 – $6,500. Call (888) 343-9048 for an exact quote – estimates are free.
Every job we do is backed by our 730-Day Done Right Promise – if it isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Call (888) 343-9048 with any warranty question.
Get a Free Estimate on Cabinets & Countertops in Anna
Want a real number for your kitchen? Call (888) 343-9048 and a live person answers, any time. We’ll schedule a free on-site estimate, measure your space, and hand you a written line-item quote – no vague ranges, no change-order games. Cabinets and countertops in Anna, done right and backed in writing.
Written by the team at Groundwork Construction Co.