New Detached ADU in Garland, TX: What It Really Takes
A new detached ADU in Garland typically runs $45,000 to $130,000 for a fully finished, permitted second dwelling on your lot, and a realistic timeline is 5 to 9 months from the first design meeting to final inspection. The number swings that wide because lot conditions in Garland’s older grid, not the unit itself, often set the price. Call (888) 343-9048 for a free on-site estimate and we’ll tell you what your specific lot can hold before you spend a dime on design.
How a Detached ADU Gets Built Here, Stage by Stage

Every detached ADU we build in Garland moves through the same five stages. Here’s what actually happens, and what you have to decide along the way.
Stage 1: Feasibility and site visit (week 1)
We walk the lot, measure buildable area against setbacks, and check how much impervious cover you already have. In Garland this is where most projects live or die, and we’d rather find the problem on day one than after you’ve paid for drawings. You’ll leave this visit knowing whether a detached ADU is realistic and roughly where on the lot it can sit.
Stage 2: Design and permitting (weeks 2 through 10)
You approve a layout, then we move into drawings and submittals. Garland permitting runs on its own clock, and plan review for a second dwelling is not a quick turnaround. During this stage you’re choosing exterior finish, roof style, and window package, because those decisions go on the permit set. Changing them later means resubmitting.
Stage 3: Site prep and foundation (weeks 10 to 14)
Once permits are in hand, we clear and grade, then pour. On Garland’s blackland clay, foundation prep is not a formality; it’s engineered for the soil movement we get here. You won’t have decisions to make during this stage, which is the point. This is us getting the part nobody sees right.
Stage 4: Framing, rough-in, and dry-in (weeks 14 to 22)
Framing goes up, then electrical, plumbing, and HVAC rough-in, then roof and windows so the structure is closed to weather. Inspections happen at each phase. This is the longest stretch and the one where the schedule can slip if a trade falls behind, which is why we keep the same background-checked, uniformed technicians on your job from rough-in to finish.
Stage 5: Finishes and final inspection (weeks 22 to 36)
Insulation, drywall, cabinets, fixtures, flooring, paint, and exterior trim. You’re making your finish selections in stage 2, so this stage is execution, not decision-making. Final inspection closes it out. Every ADU we deliver is covered by our 730-Day Done Right Promise, and the timeline above reflects what a clean job in Garland actually looks like, not a best case.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your ADU
Most of the budget lives in four decisions. Here’s the honest trade-off on each.
- Footprint and layout: A 500 to 700 sq ft one-bedroom is the sweet spot for rental income or aging parents. Push past 800 sq ft and you’re building a small house, with the cost to match. Decide early whether this is for family or tenants, because it changes everything downstream.
- Roof system: Architectural shingles from a brand like GAF or CertainTeed are the standard choice and hold up well to North Texas hail. Standing-seam metal costs more up front and handles hail and wind better over a long horizon. If you plan to keep the ADU for decades, metal earns its premium.
- Exterior finish: Brick veneer matches the surrounding Garland housing stock and ages with almost no upkeep. Fiber cement siding costs less and installs faster but needs repainting eventually. On the older streets, brick reads as native to the neighborhood and tends to appraise more cleanly.
- Fixtures and systems: A tankless water heater frees up closet space in a compact unit. Plumbing fixtures from Sterling or Grohe sit in the durable middle range; builder-grade imports save money up front and cost you in replacements. A separate electrical meter lets you rent the unit cleanly, and it’s worth the extra cost if tenants are the plan.
What a New Detached ADU Costs in Garland, TX

Plan on $45,000 to $130,000, with most Garland projects landing between $70,000 and $110,000 for a 600 sq ft one-bedroom with standard finishes. The low end is a simple footprint, standard finishes, and a lot that’s easy to build on. The high end adds square footage, premium exterior materials, a separate utility meter, and site work the older lots demand.
Five things push the number:
- Square footage: the single biggest lever. Every additional 100 sq ft adds real cost in foundation, framing, and finish.
- Lot condition: narrow lots and tight impervious-cover limits may force a smaller footprint or added drainage work.
- Utility runs: trenching power, water, and sewer from the main house to a rear ADU can run several thousand dollars depending on distance.
- Finish grade: cabinets, flooring, and fixtures move the total by tens of thousands between builder-grade and premium.
- Permit and inspection scope: a full second-dwelling permit with separate utility service takes more review time and cost than a simpler accessory structure.
A written estimate from us is line-item, upfront pricing with no surprises: site work, foundation, framing, MEP, finishes, permits, and inspections, each on its own line. It does not include landscaping beyond final grade, fencing, or appliances unless you ask for them. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat Garland Lots Specifically Do to This Job
Garland is a first-ring postwar manufacturing suburb, built largely for the workers of the Kleenex/Lakeside and Raytheon/Defense plants, and one of the largest US cities that had no freeway through it until the 1990s. That history is why the housing stock here is dominated by 1950s to 1970s single-story brick ranches on pier-and-beam or early slab foundations, and why almost all our work is on aging structures rather than greenfield builds.
For a detached ADU, that legacy matters in ways contractors from newer suburbs don’t anticipate. Lots across the older grid in 75040, 75041, and 75042 are narrow, and many already sit at or near impervious-cover limits, so setback and impervious-surface rules routinely shape the footprint before design even starts. Out toward the 75043 and 75044 subdivisions the lots open up, but those homes are 1970s and 80s builds with their own quirks. Add North Texas blackland clay that swells in wet springs and shrinks in dry summers, and foundation design becomes a real cost line, not a footnote. We’d rather plan for that movement up front than fix it later. If the ADU is part of a full Home Additions & ADU in Garland scope, we sequence the two together so the shared utilities and site work are done once.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Garland

Plan on 5 to 9 months total, with permitting alone taking 6 to 10 weeks of that. Construction itself runs 5 to 7 months once we break ground. Call (888) 343-9048 and we’ll give you a timeline specific to your lot.
Yes. A detached dwelling unit requires a building permit and passes through plan review and multiple inspections. We pull the permits and manage the inspections for you as part of the job, so you’re not chasing the city yourself.
Usually yes, but the ADU needs its own utility connections, and that means running new lines from the main service. Whether that’s a short trench or a long one depends on where the ADU sits. A separate meter is worth adding if you plan to rent the unit.
Roughly $45,000 to $130,000, with most projects in the $70,000 to $110,000 range for a 600 sq ft one-bedroom. Call (888) 343-9048 for an exact, line-item quote. Estimates are free.
Every ADU we build is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If it’s not done right, we make it right. No fine print, no conditions that shrink the coverage.
Often, yes, and homeowners often pair this with Concrete Driveways & Concrete Work in Garland so the unit has its own access, or with Paver Driveways in Garland where the frontage calls for it. Either way, we plan the site work once so you’re not paying twice.
Start With a Free On-Site Estimate
Call (888) 343-9048 to schedule a free estimate for your new detached ADU in Garland. We’ll walk the lot, check setbacks and impervious cover, and tell you plainly what fits and what it costs, with a line-item written quote. Our Home Additions & ADU service covers the full scope from foundation to finish line, and we serve homeowners throughout Garland and the surrounding communities. Calls are answered by a live person, 24/7.