A Groundwork company - serving Allen, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Allen, TX

New Detached ADU in Allen - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Allen
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Allen, TX: What It Takes and What It Costs

A new detached ADU in Allen typically runs $90,000 to $220,000 and takes 6 to 10 months from permit to final inspection, depending on size, finishes, and utility runs. Most Allen ADUs land in the 500 to 900 square foot range, built in the backyard behind the main house with its own address, entrance, and meter setup. Call (888) 343-9048 to schedule a free on-site estimate and design consult; we’ll walk the lot and tell you what fits.

Call (888) 343-9048

How a Groundwork New Detached ADU Gets Built, Stage by Stage

A remodeled family room with new windows and a window seat

Every detached ADU follows the same broad sequence, but the timing shifts with lot size, utility depth, and how fast Allen’s plan review moves. Here’s what actually happens.

Stage 1: Site walk and design (weeks 1 – 3). We walk the backyard, check setbacks, easements, and where the sewer tap and meter sit. You decide footprint, roofline, and whether the unit gets a full kitchen or a kitchenette. We pull the survey and draft a plan set for submittal.

Stage 2: HOA architectural review and city permit (weeks 3 – 10). In Allen’s master-planned subdivisions, the architectural-review committee almost always signs off before the city will issue a permit. We compile the submittal package, submit, and respond to plan-review comments. This is the longest waiting period on the job, and it’s where out-of-town crews lose weeks.

Stage 3: Site prep and foundation (weeks 10 – 14). Utility locates, trenching for water, sewer, and electrical, then the slab pour. North Texas clay cures fast in summer, so we schedule pours early and keep the crew on shaded work by mid-afternoon. You’ll pick your exterior finish and roof color here so the HOA packet stays current.

Stage 4: Framing through rough-in (weeks 14 – 24). Framing, roofing, windows, and mechanical rough-in. Inspections happen at each phase, and Allen inspectors are thorough. You finalize interior finishes now: flooring, cabinets, countertops, fixtures.

Stage 5: Finish-out and final (weeks 24 – 40). Drywall, paint, trim, fixtures, and the final inspection. Power and water get tied to the main service. We hand over the unit with a walkthrough punch list closed out.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Define Your ADU

  • Footprint and layout: A 500 sq ft studio costs less to build but limits resale appeal. A 750 to 900 sq ft one-bedroom reads as a real home and suits multi-generational use. Bigger means more foundation, roof, and mechanical cost.
  • Kitchen level: A kitchenette with a two-burner cooktop and under-counter fridge saves $8,000 to $15,000 versus a full kitchen with a full-size range and Moen or Delta fixtures. Full kitchens suit long-term rental; kitchenettes suit guest and family use.
  • Exterior cladding: James Hardie fiber cement holds up to hail and heat and matches most Allen main houses. Brick veneer costs more but matches the neighborhood look and satisfies pickier HOAs.
  • Roof and HVAC: Composition shingle matches the main house and costs less. A separate high-efficiency mini-split system runs cheaper to operate than extending the main HVAC, and it lets you meter the unit independently.
  • Bathroom: One full bath with an American Standard or Blanco vanity setup is the standard. A half bath saves money but narrows who can live there.

What a New Detached ADU Costs in Allen, TX

A framer checking new wall framing on a home addition

Plan on $90,000 to $220,000 for the full build in Allen. Most projects land near the middle of that range. Here’s how the line items balance out:

Line item Typical range
Design and permit submittal $4,000 – $12,000
Site prep and foundation $12,000 – $28,000
Shell, framing, roof, windows $30,000 – $70,000
Mechanical, electrical, plumbing $15,000 – $38,000
Interior finishes and fixtures $18,000 – $52,000
Utility trenching and connections $6,000 – $20,000

The low end holds when the lot has an easy sewer tap, the unit stays under 600 sq ft, and you choose builder-grade finishes. The high end comes from longer utility runs, a slab that needs extra prep on expansive clay, a full kitchen, or a unit over 900 sq ft. A written estimate from us covers design, permits, materials, labor, and inspections, with the number fixed before work starts. What it doesn’t cover is landscaping repair after trenching, and any HOA fees the committee charges for review. Call (888) 343-9048 for an exact figure.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Allen Homes and Lots Do to This Job

Most of Allen was built out in a single wave from the 1990s through the 2000s, so backyards here are the second-generation kind: decent size, but often already holding a pool, a storage shed, or a mature live oak that limits where a foundation can go. Lots in Watters Crossing and Twin Creeks are tight, and the 1990s-era HOA architectural-review committees in those subdivisions want roof color and shed placement approved before the city will take a permit. That’s a step crews from out of town skip, and it stalls the job. Allen’s permitting and inspection process is stricter than McKinney’s and Frisco’s newer edges, and we build the schedule around it. Then there’s the blackland clay under almost every lot: it shifts with the seasons, so the foundation has to be engineered for it, not poured flat and hoped over. If you’re also reworking the front of the property, homeowners often pair a detached ADU with Concrete Driveways & Concrete Work in Allen to add a parking pad for the unit.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Allen

A new concrete driveway with a paver border

Ready to Price a New Detached ADU in Allen?

Call (888) 343-9048 for a free on-site estimate. We’ll walk the lot, talk through footprint and finishes, and hand you a written quote with the number fixed before work starts. A live person answers around the clock, and the consult costs nothing. See how this fits a bigger plan on our Home Additions & ADU in Allen page, or start with our Home Additions & ADU service overview.

Written by the team at Groundwork Construction Co. of Allen.

Why Allen Chooses Groundwork Construction Co. of Allen

We set the standard for new detached ADU in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardware

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Allen

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Allen team

A local vetted partner works across Allen and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(888) 343-9048

Request a Free Estimate in Allen

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch